This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
UV / SV
Preheater bypass system
To improve the efficiency of a steam generator, water is pressurised and pre-heated before being fed into the boiler. The heat exchangers in this feed water system need to be protected in case there is a rupture between the steam heating pipes and the water circulation , such a rupture would severely damage downstream equipment including the turbines. The pre-heater is protected by a bypass system that diverts the feed water around the heat exchanger in the event of a problem thus protecting the entire system.
- Easy maintenance and long life.
- Monolithic body design to avoid weld joints and for cost effectiveness.
- Modular design of the valve to meet customer specifications and requirements.
- Inlet, outlet and bypass connections to match the dimensions and material of the pipework.


Product Specifications


Body style
- 3-way type, self-actuating
Operating limits
- Temperatures up to 400 °C
- Inlet pressures up to 350 bar[a]
Interfaces
- Butt-weld ends according to the customer’s specification
Seat
- Hard faced plug and seat
Bonnet
- Self-sealing bonnet
Actuator
- Feedwater powered actuator inside the valve body
Codes
- AD 2000, TRD, IBR, manufacturing acc. to ASME
Options
- Manual control valve for on-site activation of the bypass mode
- Additional limit switches for position indication
Downloads
Let IMI Critical find the right solution for your application